EN | FR

48 Oracle Primavera jobs in Canada

Project Management Intern - Construction (Field Opportunity - Saskatoon)

Saskatoon, Saskatchewan Burns & McDonnell

Posted 15 days ago

Job Viewed

Tap Again To Close

Job Description

**Description**
Our Engineering Interns are responsible for performing tasks requiring the application of standard engineering techniques and procedures. This includes standard design of engineering systems, correcting and updating designs, assisting lead engineers with various project duties, and other duties as assigned.
Specific assignments and project work vary depending on the market segments. Please see below for information on each market:
Construction
The Construction group is responsible for construction phase services in the design-build process and support for safety and health, estimating/pre-construction, field operations, quality, project management. Our team utilizes multiple project execution approaches - including self-perform, multi-subcontractor, construction only and program management.
**Qualifications**
+ Pursuing a Bachelor's degree in Construction Management, Engineering or related field from an accredited program.
+ Prior internship and/or related consulting experience Preferred
+ Actively involved in campus, community or other volunteer activities or organizations.
+ Excellent verbal and written communication skills.
+ Strong problem solving and analytical skills.
+ Basic knowledge and experience in Microsoft Office programs, including, Word, Excel, PowerPoint and Outlook.
+ Demonstrated leadership skills.
+ Self-motivated and eager learner, aptitude to grow and develop within the field.
This job posting will remain open a minimum of 72 hours and on an ongoing basis until filled.
EEO/Disabled/Veterans
**Job** Intern
**Primary Location** CA-SK-Saskatoon
**Schedule:** Full-time
**Travel:** Yes, 5 % of the Time
**Req ID:**
**Job Hire Type** Intern #LI-KO #CAN
This advertiser has chosen not to accept applicants from your region.

Project Management Intern - Construction (Field Opportunity - Toronto)

Toronto, Ontario Burns & McDonnell

Posted 15 days ago

Job Viewed

Tap Again To Close

Job Description

**Description**
Our Engineering Interns are responsible for performing tasks requiring the application of standard engineering techniques and procedures. This includes standard design of engineering systems, correcting and updating designs, assisting lead engineers with various project duties, and other duties as assigned.
Specific assignments and project work vary depending on the market segments. Please see below for information on each market:
Construction
The Construction group is responsible for construction phase services in the design-build process and support for safety and health, estimating/pre-construction, field operations, quality, project management. Our team utilizes multiple project execution approaches - including self-perform, multi-subcontractor, construction only and program management.
**Qualifications**
+ Pursuing a Bachelor's degree in Construction Management, Engineering or related field from an accredited program.
+ Prior internship and/or related consulting experience Preferred
+ Actively involved in campus, community or other volunteer activities or organizations.
+ Excellent verbal and written communication skills.
+ Strong problem solving and analytical skills.
+ Basic knowledge and experience in Microsoft Office programs, including, Word, Excel, PowerPoint and Outlook.
+ Demonstrated leadership skills.
+ Self-motivated and eager learner, aptitude to grow and develop within the field.
This job posting will remain open a minimum of 72 hours and on an ongoing basis until filled.
EEO/Disabled/Veterans
**Job** Intern
**Primary Location** CA-ON-Toronto
**Schedule:** Full-time
**Travel:** Yes, 5 % of the Time
**Req ID:**
**Job Hire Type** Intern #LI-KO #CAN
This advertiser has chosen not to accept applicants from your region.

Project Management

Premium Job
Remote $44000 - $65000 per year phorn co LTD

Posted 10 days ago

Job Viewed

Tap Again To Close

Job Description

Full time Permanent

Job Summary:
We are seeking an experienced and results-oriented Project Manager to lead and manage projects from inception through completion. The ideal candidate will be responsible for coordinating internal teams and external stakeholders to deliver projects that meet business goals, timelines, and budget constraints. This role requires a strategic thinker with excellent communication, problem-solving, and leadership skills who can manage multiple priorities in a fast-paced environment.

Key Responsibilities:
* Define project scope, goals, deliverables, and success criteria in collaboration with senior management and stakeholders.
* Develop comprehensive project plans, schedules, resource allocations, and budgets.
* Lead cross-functional project teams, ensuring timely task completion and alignment with project goals.
* Identify project risks, develop mitigation strategies, and manage changes in scope, schedule, or budget.
* Track and report project performance using appropriate tools and KPIs.
* Manage stakeholder expectations and maintain effective communication throughout the project lifecycle.
* Organize and lead project meetings, including kick-offs, stand-ups, and retrospectives.
* Ensure compliance with company policies, procedures, and quality standards.
* Evaluate project outcomes and prepare post-project reports and analysis.

Qualifications:
* Bachelor’s degree in Project Management, Business, Engineering, Computer Science, or a related field.
* 3–7 years of experience in project management (specific industry experience is a plus).
* Project Management Professional (PMP), PRINCE2, or equivalent certification is strongly preferred.
* Proficiency with project management tools such as Microsoft Project, Asana, Trello, Jira, or similar.
* Strong leadership, negotiation, and conflict-resolution skills.
* Excellent organizational and time management abilities.
* Experience with Agile/Scrum, Waterfall, or hybrid methodologies.
* Strong written and verbal communication skills.

Preferred Qualifications:
* Master’s degree in a related field.
* Agile certifications (e.g., Certified ScrumMaster, SAFe).
* Experience managing vendor relationships and third-party integrations.
* Technical background or familiarity with [industry-specific technologies/tools].

Key Competencies:
* Strategic Thinking
* Stakeholder Management
* Risk Management
* Communication and Influence
* Problem Solving
* Budgeting and Financial Acumen
* Adaptability and Resilience
* Team Leadership

Working Conditions:
* Standard office hours, with flexibility depending on project demands.
* Remote or hybrid work options may be available.
* Occasional travel may be required.

Employee Benefits:
We believe in rewarding our team with competitive compensation and a comprehensive benefits package that promotes well-being, work-life balance, and professional growth.
Core Benefits:
* Competitive salary with performance-based bonuses
* Health, dental, and vision insurance
* Life and accidental death insurance
* Paid time off (vacation, sick days, personal days)
* Paid holidays
* Retirement plan with company match (e.g., 401(k))
* Short-term and long-term disability coverage
* Employee wellness programs
Professional Development:
* Annual training and development allowance
* Reimbursement for certification and continuing education
* Internal mobility and career growth opportunities
* Access to conferences, workshops, and industry events
Work-Life Balance & Perks:
* Flexible work hours and remote work options
* Employee Assistance Program (EAP)
* Team-building activities and off-site retreats
* Casual dress code
* Recognition and rewards programs
* Parental leave and family support policies
Closing Statement:
If you are enthusiastic about Project Management and eager to join a forward-thinking team, we encourage you to apply.

EEO Statement:
We are an Equal Opportunity Employer and do not discriminate against any employee or applicant for employment because of race, color, sex, age, national origin, religion, sexual orientation, gender identity, status as a veteran, and basis of disability or any other federal, state, or local protected class.

Company Details

We achieve this success without ever compromising our values by providing quality construction practices, effective communication, and a deep understanding of the building environment. Our long history in New York City and the Tri-State area enables us to navigate agencies and regulations with ease and to anticipate issues before they become problems. This experience ensures that each project is completed seamlessly and responsibly. As a commercial construction company, we support New York City’s businesses today and inspire what’s yet to come tomorrow. At Konstruction, we help every client see their vision come to life.
This advertiser has chosen not to accept applicants from your region.

Project Management Lead

Edmonton, Alberta Stantec

Posted 22 days ago

Job Viewed

Tap Again To Close

Job Description

When you care deeply about the work you do, it's rewarding to see it through from concept to completion. We partner with clients to provide both program management and construction management to strategize, plan, and implement projects that drive organizations forward. From hospitals and airports to university campuses, mass transit systems, water treatment facilities, mines, and wind farms, we've successfully managed thousands of projects.
Joining our team, turning visionary ideas into reality, will shape your future-and the future of your community.
Your Opportunity
Stantec is seeking a Project Management Lead to join our team - we have exciting projects and ongoing pursuits! You will lead a team of project managers, project controllers, and other project management support personnel responsible for the successful execution of a program of energy and resources projects . In this position, Project Management lead directs and supervises activities related to stakeholder deliverables, contract administration, change orders, submittals, procurement, project financial projections, and schedule requirements to ensure projects meet quality expectations and are delivered, on time and on budget while adhering to our client's and Stantec's Safety culture.
Your Key Responsibilities
- Providing day-to-day guidance to a team of project managers, project controllers, schedulers, estimators, and other project management support personnel
- Responsible for managing some projects within the program as project manager, managing scope, schedule, budget, quality, and risk in compliance with Stantec's PM framework.
- Work collaboratively with and lead multi-disciplinary project and technical staff in developing solutions to project challenges and establish project objectives, procedures, and performance standards.
- Interact internally throughout the organization with staff at all levels as well as externally with clients.
- Exercise initiative in addressing problem situations and work collaboratively to resolve most project delivery-related matters.
- Lead by example with active support of internal policies and practices, including risk management, project management, and quality management.
- Develop and foster client relationships to facilitate project activities.
- Maintain and enhance our reputation with clients, approval agencies and industry professionals as an outstanding service provider.
Your Capabilities and Credentials
- Specialized project management skills, with experience in organizing, planning, and executing public and private projects from pursuit through closeout, involving internal personnel, contractors, and vendors.
- Must have excellent verbal and written communication skills and the ability to convey program and project delivery needs to the client and to formulate those needs into comprehensive proposals.
- Demonstrated organizational skills and ability to work on multiple projects and activities simultaneously.
- The position involves work associated with critical infrastructure; therefore, a client background check is required.
- Strong technical understanding of large infrastructure, organizations and processes required.
- Demonstrated successful experience in leadership, including defining and setting the direction for a team, and project; strategy development; change management; and corporate stewardship.
- Knowledgeable in relevant areas of construction and understanding of various design and construction contracting methods and processes.
- Knowledge of local, and federal building codes, construction principles, techniques and procedures, occupational hazards, and safety precautions.
- Experience supporting sales processes for acquisition of new program opportunities and startup of new capital infrastructure programs is desirable.
- Ability to be an independent thinker capable of solving problems within a team environment by analyzing technical issues, applying underlying principles, and delivering cost-effective solutions that provide value to clients.
- Travel to local and out-of-province project sites and client offices will be required.
Education and Experience
- Minimum 10 years' relevant experience in project management preferably for large engineering, design, and construction projects
- Minimum 5 years relevant experience leading a team of project managers and project management support staff.
- Bachelor's degree in engineering or sciences, master's degree is considered an asset.
- Project Management Professional (PMP) or Professional Engineer (PE) is preferred.
This description is not a comprehensive list of activities, duties, or responsibilities.
Responsibilities may change at any time with or without notice.
Stantec is a place where the best and brightest come to build on each other's talents, do exciting work, and make an impact on the world around us. Join us and redefine your personal best.
**Primary Location:** Canada | AB | Edmonton
**Organization:** BC-1262 Transpt-CA PMCM
**Employee Status:** Regular
**Travel:** Yes
**Schedule:** Full time
**Job Posting:** 16/06/ :06:39
**Req ID:** REQ MQ
This advertiser has chosen not to accept applicants from your region.

Project Management Intern

Calgary, Alberta Canam

Posted today

Job Viewed

Tap Again To Close

Job Description

Job Description

Job Description

Job Description

We have an exciting opportunity for a onsite Project Management Intern within our team!

As an intern at Canam, your mandate will be to assist the Project Manager and Site Superintendent with the management and supervision of a structural steel erection project. 

You will be based physically on a construction site in Calgary, AB on a full-time basis for approximately 12 months. Standard working schedule is onsite Monday to Friday, 40 hours per week. Start times may vary depending on site schedule and needs. The successful intern must be willing to work overtime if required to support the job site, teams and schedule.

 Duties:

  • Collect data on site and update the construction schedule (MS Project, Smartsheet, Google Workspace)
  • Produce erection progress and site daily reports (PlanGrid/AutoDesk, Trimble Connect)
  • Assist the Site Superintendent with quality control
  • Follow up on the delivery schedule and validate delivery slips
  • Participate to coordination meetings with the engineering, detailing and fabrication team
  • Attend on-site coordination meetings with the General Contractor
  • Assist the steel erector in repair request (field works and deficiencies)
  • Assist with health and safety recordings
  • Scheduling the project life cycle using MS project software or Smartsheet
  • Other duties as required and assigned by the supervisor
Qualifications

The successful candidate will possess: 

  • Civil Engineering/Construction Management bachelor degree in progress - ideally third year or higher
  • Working knowledge of Google Workspace, MS Office 365, Project and other software; computer experience with AutoCAD preferred
  • Autonomy and ability to manage priorities
  • Willingness to progress, learn, discover, and be part of a high functioning/fast-paced team
  • Exceptional organizational and English communication skills (verbal and written)
  • Bilingualism (English and French) would be considered an asset
  • The ability to effectively multitask and manage multiple priorities
  • Punctuality, maturity, reliability, an ability to work well under pressure with frequent interruptions while delivering exceptional customer service is essential to excel in this role
  • Candidates must be willing to travel to the assigned construction site. Travel and accommodations by Canam, if required
  • Ability to drive - license required


Additional Information

Work environment:
Working safely is a condition of employment at Canam. The role involves a general office setting and constant exposure to computer display. Safety PPE (personal protective equipment) must be worn while onsite (steel-toed safety boots, safety glasses, etc.) Daily interactions include engaging with construction site personnel, managers and other team members.

Remuneration:
We offer a competitive compensation and benefits package.

Company description:
Canam Group specializes in designing and fabricating metal components for the North American construction industry. The Company is active in the sectors of buildings and infrastructure. Canam Group operates 10 plants in Canada and the United States, as well as engineering offices in Canada, Romania, India and the Philippines and has over 5,100 employees.

Canam appreciates your interest in this position. Please note, however, that only those applicants selected for an interview will be contacted.

This advertiser has chosen not to accept applicants from your region.

Team Manager, Project Management

Pickering, Ontario UPattison Sign Group

Posted today

Job Viewed

Tap Again To Close

Job Description

Job Description

Job Description

Who we are:

Pattison ID helps companies deploy their identity for maximum consistency, engagement and impact across physical and digital signage, and branded environments. Our comprehensive signage solutions, including exterior, interior, wayfinding, and digital signage, redefine how brands connect with their audiences.

Our Solutions:

We offer architectural, digital services, sign maintenance solutions and flexible leasing options. As one of the largest companies in our industry, with 7 manufacturing facilities, 8 sales and operations offices, and over 1,000 employees across the US and Canada, Pattison ID is committed to offering a culture where team members can achieve their unique career ambitions, while embodying our Core Values of Innovation, Delight, Dependability, Involvement and Drive.

Essential Functions: What you’ll do:

  • Must be able to perform all functions of a project manager and run projects independently as needed
  • Maintain superior customer service to corporate and regional customer contacts
  • Ensure organizational objectives relating to customer service are achieved, including reduced lead times, on-time delivery, and effective customer communications, and provide feedback to management on status of same
  • Monthly revenue forecast management and delivery of expected sales: monthly, quarterly, annually by business segment
  • Grow customer profile in conjunction with Director, Account Manager, and National Sales Executive
  • Meet & improve execution timelines from customer’s perspective
  • Manage RFP requests and potential price increases Meet & improve selling margins
  • Minimizing number of non-conformities on account
  • Analyze team workload requirements and manage resources to maintain expected level of service
  • Help develop, and train multiple high-performance teams committed to excellence for every customer and project
  • Setting strategic goals and ensuring alignment with company objectives
  • Providing leadership and mentorship to multiple teams
  • Work with Directors of Project Management to identify areas for improvement and development within specific industry segments or programs.

Key Skills and Requirements :

  • Leadership and coaching
  • Advanced project management skills
  • Decision-making under pressure
  • End-to-end project management
  • Resource coordination Risk management and problem-solving
  • Familiarity with installation and invoicing workflows
  • Basic project management skills, good communication, and organizational abilities
  • Advanced project management skills, strategic thinking and extensive experience in project management
  • Ability to multi-task between multiple high priority projects, leading larger more complex projects
  • Previous Sign or Equivalent Industry experience, 5 plus years .

This advertiser has chosen not to accept applicants from your region.

Project Management Technical Specialist

Valcourt, Quebec BRP

Posted 7 days ago

Job Viewed

Tap Again To Close

Job Description

Join our Center of Excellence in Product Development (NPD CoE) as a Technical Specialist in Project Management. Under the direction of the Project Management Business Process Manager, you will use your expertise to support and enhance project management processes in engineering.

YOU'LL HAVE THE OPPORTUNITY TO:

  • Implement technical tools to enhance project management.

  • Apply your expertise to optimize engineering project management.

  • Collaborate closely with project managers to ensure the success of initiatives.

  • Communicate technical concepts to engineering teams.

  • Train and mentor teams to strengthen their project management skills.

YOU’LL THRIVE IN THIS ROLE IF YOU HAVE THE FOLLOWING SKILLS AND QUALITIES:

  • Strong technical expertise in a field relevant to project management.

  • Excellent communication skills, with the ability to translate technical concepts for non-technical teams.'

  • French and English bilingualism as there are interactions with internal parties in Finland and Mexico.

  • The ability to work collaboratively with multidisciplinary teams.

  • Experience in training and mentoring to develop others' skills.

  • The ability to identify and implement process improvements.

Do you have other qualifications? Tell us what is unique about you that is a great addition to the team.

ACKNOWLEDGING THE POWER OF DIVERSITY

BRP is dedicated to nurturing a culture that invites, connects, and propels the ambitions of people of all backgrounds, profiles, beliefs and experiences. Ultimately, the diversity and uniqueness of our people fuel our ingenuity and set the course for the path ahead!

For this reason, we value diversity and we strive to always push each other forward to build an inclusive workplace where every employee feels like they belong, where they can grow and find meaning.

AT BRP, WHEN WE TALK ABOUT BENEFITS, WE GO ALL IN.

Let’s start with a strong foundation - You want it, we have it:

  • Annual bonus based on the company’s financial results

  • Generous paid time away

  • Pension plan

  • Collective saving opportunities

  • Industry leading healthcare fully paid by BRP

What about some feel good perks:

  • Flexible work schedule

  • A summer schedule that varies by department and location

  • Holiday season shutdown

  • Educational resources

  • Discount on BRP products

WELCOME TO BRP

We’re a world leader in recreational vehicles and boats, creating innovative ways to move on snow, water, asphalt, dirt and even in the air. Headquartered in the Canadian town of Valcourt, Quebec, our company is rooted in a spirit of ingenuity and intense customer focus. Today, we operate manufacturing facilities in Canada, the United States, Mexico, Finland, Australia and Austria, with a workforce made up of close to 16,500 spirited people, all driven by the deeply held belief that at work, as with life itself, it’s not about the destination: It’s about the journey.

#LI-Hybrid
#LI-MM1

This advertiser has chosen not to accept applicants from your region.
Be The First To Know

About the latest Oracle primavera Jobs in Canada !

 

Nearby Locations

Other Jobs Near Me

Industry

  1. request_quote Accounting
  2. work Administrative
  3. eco Agriculture Forestry
  4. smart_toy AI & Emerging Technologies
  5. school Apprenticeships & Trainee
  6. apartment Architecture
  7. palette Arts & Entertainment
  8. directions_car Automotive
  9. flight_takeoff Aviation
  10. account_balance Banking & Finance
  11. local_florist Beauty & Wellness
  12. restaurant Catering
  13. volunteer_activism Charity & Voluntary
  14. science Chemical Engineering
  15. child_friendly Childcare
  16. foundation Civil Engineering
  17. clean_hands Cleaning & Sanitation
  18. diversity_3 Community & Social Care
  19. construction Construction
  20. brush Creative & Digital
  21. currency_bitcoin Crypto & Blockchain
  22. support_agent Customer Service & Helpdesk
  23. medical_services Dental
  24. medical_services Driving & Transport
  25. medical_services E Commerce & Social Media
  26. school Education & Teaching
  27. electrical_services Electrical Engineering
  28. bolt Energy
  29. local_mall Fmcg
  30. gavel Government & Non Profit
  31. emoji_events Graduate
  32. health_and_safety Healthcare
  33. beach_access Hospitality & Tourism
  34. groups Human Resources
  35. precision_manufacturing Industrial Engineering
  36. security Information Security
  37. handyman Installation & Maintenance
  38. policy Insurance
  39. code IT & Software
  40. gavel Legal
  41. sports_soccer Leisure & Sports
  42. inventory_2 Logistics & Warehousing
  43. supervisor_account Management
  44. supervisor_account Management Consultancy
  45. supervisor_account Manufacturing & Production
  46. campaign Marketing
  47. build Mechanical Engineering
  48. perm_media Media & PR
  49. local_hospital Medical
  50. local_hospital Military & Public Safety
  51. local_hospital Mining
  52. medical_services Nursing
  53. local_gas_station Oil & Gas
  54. biotech Pharmaceutical
  55. checklist_rtl Project Management
  56. shopping_bag Purchasing
  57. home_work Real Estate
  58. person_search Recruitment Consultancy
  59. store Retail
  60. point_of_sale Sales
  61. science Scientific Research & Development
  62. wifi Telecoms
  63. psychology Therapy
  64. pets Veterinary
View All Oracle Primavera Jobs